Whether you purchase a Stand Alone or Weld-In / Mounted RUD, the following video shows the full assembly process from start to finish, including axel assembly, spooling of drums, winch installation, ending with the legs and crossbeam assembly and affixing to the RUD. Adding the roll up door (consumable) itself is not shown in this video.
Installation (Conex Box Shown)
Shown in this video is the installation of the brackets to the struts and crossbeam and the affixing of them to the RUD on our Conex Box Training Center.
Setup for Training
Once the RUD Prop is assembled and installed, be it into a Conex Box (shown) or as a Stand Alone unit, adding a roll up door to it comes next. Shown in this video is the proper way of setting up the RUD with rollup door affixed in preparation for a training evolution.